Crew planning with AI chat

Crew planning is math plus judgment. Let the chat tool do the math from your production numbers. Keep the judgment.

Updated Oct 15, 2026 · ~7 min read · Not sponsored by any AI company

Feed it your production numbers

The tool has no idea how fast your crews set posts in clay versus sand. Write down your own averages, rough is fine, and paste them at the top of every planning chat.

Prompt · Your shop's day sizesAny chat assistant
Our production assumptions (use these, do not change them):
- 2-man crew, vinyl privacy, soft soil: about 120-150 ft/day
- Same in rock: about 60-80 ft/day
- Each walk gate adds about 45 min; each double drive gate adds about 2 hrs
- Tear-out and haul-off of old wood fence: about 1 hr per 50 ft
- Concrete set before hanging panels: next day

Planning prompts

Prompt · Size the jobAny chat assistant
Using our production assumptions, estimate crew days for this job:
220 ft 6 ft vinyl privacy, rock likely on back line (~90 ft), 2 walk gates, 1 double drive, tear out 220 ft old wood.
Show the math line by line. Round up to half days. Flag anything you had to assume.
Prompt · Material pull listAny chat assistant
Make a pull list for the job above: posts (line, corner, end, gate), panels, gate kits, post caps, concrete bags, and hardware.
Use these rules: 8 ft sections, gate posts get 2 extra bags, add 1 spare panel per 10.
Show the counts as a checklist the yard guy can tick off. Mark every count you calculated so I can check it.
Prompt · Toolbox talkAny chat assistant
Write a 3-minute toolbox talk for a fence crew on hand digging near utility marks.
Plain words, short sentences, 5 key points, one real-sounding example, end with 2 questions to ask the crew.
Do not cite statistics.

Check its math

Shop guardrails